Import a plan
A plan is the reference document on which you place your viewpoints.
Importing a PDF
Section titled “Importing a PDF”- In the project, tap Add a plan.
- Choose Import a PDF.
- Select one or more files.
- Check the summary, then tap Import.
Each file shows its progress. The import continues if you move to another screen.
A multi-page PDF becomes several plans
Section titled “A multi-page PDF becomes several plans”A plan always corresponds to a single page. So an 8-page PDF becomes 8 separate plans, in document order.
The confirmation screen tells you before the import starts, and you can rename and reorder the plans afterwards. This is the same behaviour as on iPhone, iPad and in the browser.
Photographing a paper plan
Section titled “Photographing a paper plan”This is the most common case in the field: the plan is pinned to the site office wall and you do not have the file.
- Tap Add a plan.
- Choose Take photo, or Plan from photo to start from an image in your gallery.
- Frame the plan flat on and shoot.
The plan is created under the name “Photo plan”, which you can rename right away.
Rename, reorder, delete
Section titled “Rename, reorder, delete”Each plan card has a ⋮ button offering Open, Rename and Delete. Pressing and holding the card opens the same menu. The plan’s row in the project sidebar has its own ⋮ with Rename and Delete, and so does the Plan settings menu of an open plan.
- Rename the plan.
- Reorder by dragging. The order is the one your reports will use.
- Delete: the confirmation tells you what goes with the plan (its viewpoints, photos and audio notes). Changed your mind? Tap Undo in the bar that shows for 8 seconds, or restore the plan within 7 days from Project settings > Recently deleted. See Recently deleted.
If the import fails
Section titled “If the import fails”| Message | What to do |
|---|---|
| Only PDF files are accepted | Use Plan from photo for an image |
| File too large | Shrink or split the PDF before importing |
| Storage quota exceeded | Free up space or change plan. See Storage |
Importing a plan needs a connection. Without a network the action is marked unavailable.